This link will take you to a current copy of the national wood flooring association installation guidelines.
Wood flooring guidelines for installation.
Installation guidelines nwfa information available as of november 17 2008.
Member company employees.
Available in print online and through our hardwood floors magazine app it s impossible to miss an article.
Installation instructions warranties brochures certifications sell sheets videos.
Authorities through review of longstanding installation principles along with research and data regarding wood flooring installation.
Guidelines should be construed as a warranty or guarantee that adhering to these guidelines will necessarily result in the proper installation and functioning of hardwood flooring due to the generic nature of the guidelines.
Start the installation at the longest unobstructed wall.
Join the ends of the boards over a floor joist where possible avoiding joints that form an h.
Wood monsters warranties are dependent upon installers following and adhering to these guidelines.
Do not deliver wood flooring to the jobsite or install wood flooring until the building is enclosed.
Engineered hardwood guide to choosing a hardwood floor 10 things to know about hardwood installation how to clean hardwood room inspiration guide.
Installer owner responsibility carefully inspect all material prior to installation for defects.
These guidelines and methods address a variety of ancillary products and components related to the installation of wood flooring but are not intended to address issues arising to or from those components directly.
For instance solid hardwood flooring is typically nailed down during installation while tongue and groove engineered flooring is usually clicked together or completely glued down.
1 national wood flooring association 2007 l revised 05 2012 wood flooring installation guidelines and methods 111 chesterfield industrial boulevard chesterfield mo 63005 800 422 4556 usa canada 636 519 9663 international.
Keep joints that line up at least two rows apart.
These are the guidelines that reputable hardwood flooring installers will follow and adhere to.
Remove the shoe molding and snap a chalk line 3 8 out from the baseboard this allows for expansion in the hot humid weather and contraction in the colder drier weather of the hardwood flooring.
Install hardwood floors perpendicular to the floor joists parallel to the longest wall leaving a inch expansion gap around the perimeter.
If heating and or air conditioning is in operating condition it needs to be operating.